The Dutch Environmental Database is responsible for preparing and maintaining category 3 environmental declarations for both Civil Engineering (GWW) and Buildings & Infrastructure (B&U). On this page, you can read about the latest developments and the schedule for quality improvements. 

Category 3 environmental declarations are periodically revised and expanded, phased per element group for both the residential and non-residential building sector (B&U) and civil engineering (GWW). This page provides the current schedule for this quality improvement, an overview of new and deactivated environmental declarations, and an explanation of products that are deliberately excluded from the database.

Current status

Category 3 environmental declarations form an essential foundation for environmental performance calculations in construction. It is therefore crucial that these declarations remain consistent and up to date.

Over the past years, the Dutch Environmental Database has carried out large-scale quality improvements for Civil Engineering (GWW) data, updating and strengthening many background reports and environmental declarations. For Buildings & Infrastructure (B&U), the first phase of quality improvement has begun, with new background reports and environmental declarations being prepared for each element.

However, the work is not yet complete. Some GWW reports are now several years old and require revision, while many B&U elements still lack reports. In 2025 and 2026, the Dutch Environmental Database will take further steps to enhance the quality, coverage, and currency of category 3 data.

Excel list of new and deactivated environmental declarations

The Dutch Environmental Database periodically publishes an overview of new and deactivated environmental declarations within category 3 data.

The lists for both Buildings & Infrastructure (B&U) and Civil Engineering (GWW) will be added soon. Once available, you can download them here.

New and deactivated environmental declarations (Dutch only) -

Excluded products

The Dutch Environmental Database continuously works to improve category 3 data, including assessing whether new products should be added to the Dutch Environmental Database.

In some cases, however, a deliberate decision is made not to prepare an environmental declaration for a specific product. This may be due to several reasons, such as:

  • The product is used on a very small scale.
  • There is insufficient reliable environmental data available.
  • The product falls outside the scope of the current Environmental Performance Assessment Method for Construction Works.

In recent background reports, the Dutch Environmental Database includes an overview of these excluded products, along with the reasoning. Once this list is available, it will be published on this page.

Schedule and status

The tables below show the current status and planning of updates. For B&U, publication may be postponed if a data change significantly impacts compliance with the environmental performance requirement (MPG). In such cases, the Dutch Environmental Database will decide, in consultation with the Ministry of the Interior and Kingdom Relations (BZK), when the relevant data will be published.

Updated on february 12 2026
Element/component B&U Status Publication date
13 en 23 Vloeren Published 30 juli 2025
32 Binnenwandopeningen Published 30 juli 2025
61 PV panelen Published 11 november 2025
56 Warmtepompen Published 19 december 2025
53 Boilers en buffervaten Published

19 december 2025

Biobased plaatmaterialen en composiet Published 30 januari 2026
Energiedragers Published 14 mei 2026
56 Afgiftesystemen

Impactanalysis

Q3 2026
66 Liften Ongoing Q3 2026
Brandveiligheid Ongoing Q3 2026
16 Funderingsconstructies
17 Paalfunderingen
28 Hoofddraagconstructies
Impactanalysis Q3 2026

27 Daken

37 Dakopeningen

Impactanalysis Q3 2026
47 Dakafwerkingen  Ongoing Q3 2026
31 Buitenwandopeningen Ongoing Q3 2026
55 Koude-opwekking
56 Warmte-opwekking
57 Luchtbehandeling
Impactanalysis Q3 2026
61 Centrale elektrotechnische voorzieningen Impactanalysis Q3 2026
Isolatiematerialen Impactanalysis Q3 2026
24 Trappen en hellingen
34 Balustrades en leuningen
Ongoing Q3 2026

21 Buitenwanden
41 Buitenwandafwerkingen
22 Binnenwanden    
42 Binnenwandafwerkingen
45 Plafondafwerkingen
43 Vloerafwerkingen
33 Vloeropeningen 

Ongoing Q3 2026

62 Laadpalen infrastructuur

63 Verlichtingarmaturen

Impactanalysis Q3 2026

52 Afvoeren

53 Water

54 Gassen

65 Beveiliging

Ongoing Q3 2026
Restperceel installaties Ongoing Q3 2026

 

Element/component GWW Status Publication date
H33 Afschermingsvoorzieningen
H52 Kust- en oeverwerken
H53 Remming-, aanleg-, en afmeerwerken
H41 Funderingsconstructies: Damwanden staal
H61 Werken van algemene aard (tijdelijk)
Completed Maart 2026
H47 Kunstwerken Completed Maart 2026
H22 Grondwerken
H51 Groenvoorzieningen
H64 Faunavoorzieningen
H71 Speeltoestellen
Completed Maart 2026
H34 Verlichting
H35.4 Bovengrondse voorzieningen
H90 en H91 GWW installaties
Completed Maart 2026
H25 Leidingwerken
H83 Elementenverharding 
Completed Maart 2026
H80 Funderingslagen
H81 Bitumineuzeverhardingen
Completed Maart 2026
H32 Wegbebakening en bebording en bewegwijzering Completed Maart 2026
H17 Verontreinigde grond en verontreinigd water
H99 Voegovergangen
Ongoing Q3 2026
H99.9: Biobased (weg)meubilair Completed Maart 2026

 

FAQ

How is category 3 data updated?

The underlying basic processes of category 3 data automatically follow updates to the NMD process database, for example an Ecoinvent update. The category 3 environmental declarations themselves, meaning the underlying LCAs and reports, are not revised continuously. This happens in planned batches per element group, a process that spans multiple years. The current schedule is available in the tables above.

Why can publication of new category 3 data be postponed?

For the residential and non-residential building sector, publication can be postponed if a data change has a major impact on meeting the environmental performance requirement. Stichting NMD decides this in consultation with the Ministry of the Interior and Kingdom Relations.